reduce text increase text email friend print

Small Towns Water Quality Fund projects

On this page

Table: Small Towns Water Quality Fund - Round 1 Funded Projects
Applicant Project title Details DSE Funding contribution
West Wimmera Shire Council Apsley Domestic Wastewater Management Project Upgrade and replacement of failing septic tanks, installation of grey water systems and fitting of houses with dual flush cisterns and low flow showerheads. $213,052
Central Highlands Water Avoca Desalination Project Construction of 0.5ML/day reverse osmosis desalination plant, pipeline, evaporation pond and back-up production bore at Bung Bong. $500,000
East Gippsland Water Bemm River Sewerage Project Upgrade of septic tanks, effluent collection and pumping to further treatment using low flow sand filter and polishing treatment. Delivery of recycled water into wetland area. $870,000
Towong Shire Council Eskdale Water Supply Project Installation of a pump on Mitta River and decommissioning of two existing private schemes pumping from the Little Snowy Creek. Construction of a water treatment plant, and connection to properties. $225,000 
West Wimmera Shire Council Goroke Domestic Wastewater Management Project Upgrade and replacement of failing septic tanks, installation of grey water systems and fitting of houses with dual flush cisterns and low flow showerheads. $299,242
West Wimmera Shire Council Harrow Domestic Wastewater Management Project Upgrade and replacement of failing septic tanks, installation of grey water systems and fitting of houses with dual flush cisterns and low flow showerheads. $172,522
Pyrenees Shire Council Snake Valley Sewerage Project Upgrade of septic tanks, effluent collection and pumping to further treatment, construction of a modular secondary wastewater treatment plant. Delivery of recycled water to Snake Valley Golf Course. $1,000,000 
Towong Shire Council Walwa Sewerage Project Land acquisition. Upgrade and replacement of septic tanks. Construction of a Septic Tank Effluent Disposal (STED) system, reticulation pipe and transfer mains. Construction of a lagoon treatment facility and reuse of the treated water of public facilities. $267,000
Total Amount Funded  $3,546,816 
Table: Small Towns Water Quality Fund - Round 2 Funded Projects
Applicant Project title Details DSE Funding contribution
North East Water Whitfield water improvement scheme  Installation of a pump and pump station on the King River. Construction of new water treatment plant and raw water and clear water storage tanks, connection to town supply and decommissioning of existing supply  $675,000

North East Water

Springhurst water improvement scheme Surveys, plans, and permits for pipeline, traffic management works, installation of pipeline from Chiltern, install new clear water tank, commission new supply source $975,000

Lower Murray Water 

Millewa water quality improvement scheme  Planning and design of scheme, construction of new water treatment plant and lagoons; media filtration, chlorination and disinfection at three locations.  $1,000,000

Wannon Water 

Cavendish water quality improvement project  Installation of shade cloth across reservoir, telemetry installed for water quality monitoring, disinfection unit, valves and fittings  $89,719

East Gippsland Water

Mallacoota water quality improvement project  Installation of shade cloth across water storage $243,500

East Gippsland Water 

Swifts Creek water security project  Dismantle existing tank and relocate, reinstate safety measures, install new liner, pipes and fittings and connect to town supply  $207,500

Central Highlands Water

Lexton water improvement scheme  Construct pipeline between Waubra bore field storage and Lexton, connection to the Lexton clear water storage, installation of flow telemetry & restriction valves  $1,000,000
Wannon Water West Portland sewerage scheme Construction of a reticulated sewerage system to 133 properties in West Portland  $767,443
Total Amount Funded 
$4,958,162
Table: Small Towns Water Quality Fund - Round 3 Projects Allocated Funding
Applicant Project title Details DSE Funding contribution
South Gippsland Water Alberton sewerage scheme Connection of town to pressure sewerage system, including pump unit, piping to treatment plant, air scour and isolations valves, and reinstatement of road surface $1,000,000
Wangaratta Shire Moyhu wastewater treatment system Installation of a modified conventional sewerage system, decommissioning of on-site septic tanks and a gravity reticulation system, pipeline  to convey sewage to treatment and reuse facility $1,000,000
Rural City of Benalla Community wastewater education program – Healthy Land – Baddaginnie (pilot project) Development of community education materials to improve efficiency and lifespan of septic systems, installation of a range of wastewater improvement options and assessment of their effectiveness $65,000
Grampians
Wimmera Mallee Water
Pimpinio Point of Entry water quality improvement – Governance and management Investigate long term reliability and financial viability of Point of Entry water treatment systems, including governance and management mechanisms $105,500 
Grampians
Wimmera Mallee Water
Quambatook water quality improvement scheme Installation of microfibre filtration unit & coagulation tanks upstream of Granulated Activated Carbon filters to reduce potable supply turbidity & increase lifespan of the GAC media $156,250
Grampians
Wimmera Mallee Water
Wycheproof water quality improvement scheme Installation of a 2 ML/day ultra filtration treatment plant to augment the existing UV disinfection system and merged into the newly constructed treatment plant $1,000,000
Total Amount Funded  $3,326,750